Solar Ops ROI Calculator

Quantify the "Administrative Tax" on your 2026 operations and identify your path to Stage 3 scaling.

Total Annual Operational Leakage
$0
$0 Admin Tax Syncing Friction
$0 MPU Drain Electric Friction
$0 Cash Flow Lag Billing Latency
0% Lumen Efficiency Score

Status Audit

Adjust the sliders to analyze your tech-stack friction.

✦ The Logic Behind the Audit:

Our calculations are based on the 2026 Solar Ops Reality Check—a study of Stage 2 and 3 installer friction.

  • Admin Tax: Calculated based on the $800/install average Ops coordination waste identified in the 2026 Reality Check.
  • Electrical Friction: Based on the industry average $3,000 unquoted MPU discovery cost.
  • Cash Flow Lag: Calculated using the daily interest cost of capital for delayed milestone billing.